Read more about the article Leader of the Pack
LOTP 5

Leader of the Pack

  • Post author:
  • Post category:

Burkholder's HVAC designed and installed a 75-ton HVAC system for Leader of The Pack’s new 28,000 SF dog day care and kennel located in Easton. This new system features split…

Continue ReadingLeader of the Pack
Read more about the article Hyatt Place
burkholder commercial hyatt project 1 scaled

Hyatt Place

  • Post author:
  • Post category:

Burkholder's HVAC designed and built the HVAC system for the new Hyatt Place hotel and restaurant located in Allentown, PA.

Continue ReadingHyatt Place
Read more about the article Yergey Brewing
Yergey Brewing Inside Front scaled

Yergey Brewing

  • Post author:
  • Post category:

Burkholder's HVAC designed and built the HVAC system for the new Yergey Brewing location in Emmaus, PA.

Continue ReadingYergey Brewing
Read more about the article Social Still
social still 23 scaled

Social Still

  • Post author:
  • Post category:

Burkholder's HVAC designed and built the HVAC system for a renovated historic bank building that was converted into a manufacturing distillery, bar, and restaurant.

Continue ReadingSocial Still