DLP Project Highlight
We completed an HVAC installation at a 5-story DLP building with 118 apartments and condos.
We completed an HVAC installation at a 5-story DLP building with 118 apartments and condos.
When BSI needed to upgrade the aging HVAC system in their new building on the South Side of Bethlehem, they turned to Burkholder's HVAC.
Burkholder's HVAC removed and replaced two Season 4 custom packaged rooftop units in downtown Easton, PA.
Burkholder's HVAC designed and installed the HVAC system for the new gym within the Executive Education Academy Charter School in Allentown, PA.
Norac Bakerly contracted Burkholder's HVAC to design and install the HVAC system for their first American manufacturing plant in Forks Township, Pennsylvania. The 79,160 SF facility makes French-inspired treats that are distributed nationwide.
Burkholder's HVAC designed and installed the HVAC system along with spiral ductwork to fit this early 1900s renovated firehouse.
Burkholder's HVAC installed new systems in the school behind the church splitting the area into 5 zones of heating and cooling.
Burkholder's HVAC installed a geothermal heat pump system and a boiler with ducting on the crematorium oven.
Burkholder's HVAC Designed And Installed The HVAC System For Metro Beauty Academy In Allentown, PA.
Burkholder's HVAC Designed And Installed The HVAC System For A Corporate Office Building In Allentown, PA.