SLHN – Bone Joint Institute
PROJECT TYPE: Design Build
INDUSTRY TYPE: Healthcare
The goal of this project was to design and build the HVAC system for a 25,000 SF three-story medical office building. There are four VRV heat recovery systems in this building with 68 tons in total.