Norac Bakerly

Bakerly Forks Twp Pennsylvania Exterior

PROJECT TYPE: Design Build
INDUSTRY TYPE: Commercial

The goal of the project was to design and install the HVAC system for Bakerly’s first American manufacturing plant. Burkholder’s used two indoor packaged air handling units for distribution of air through duct sox, two gas-fired make-up air units: servicing the main production and sanitation room, four gas-fired rooftop units, four tankless water heaters used for wash down areas, six gas-fired unit heaters ranging from 100,000 to 400,000 BTU, numerous roof mounted supply and exhaust fans, and plant aluminum pipe compressed air distribution system for owner supplied air compressors.