Lehigh Valley Plastics

PROJECT TYPE: Design Build
INDUSTRY TYPE: Industrial

The goal of the project was to design and install the HVAC system for the production facility utilizing five 40-Ton rooftop units and to relocate the entire dust collection system from an existing building. Once the structural steel was reinforced, the rooftop HVAC units were installed, equally spaced, on the roof and new spiral ductwork was installed for even air distribution throughout the area. The relocation of the dust collection was accomplished by installing new Quick-Fit Nor-Fab ductwork mains, requiring close coordination with Lehigh Valley Plastics’ Plant Engineers to determine the exact placement of the duct drops for their equipment.