Centre Square Commons
PROJECT TYPE: Plan and Spec
INDUSTRY TYPE: Commercial
The goal of this project was to coordinate multiple retailers to install 48 roof-top units at this 5-building shopping center. This project has 48 rooftop units ranging from 4 ton to 10-ton capacity and 1-Seasons 4 unit for the anchor store providing 34 tons of cooling and 3- 90+ gas furnaces with A/C. On building 2, Burkholder’s lifted and set 21 rooftop units in 5 hours. To do this, they used one tractor-trailer with 20 units and a small pickup truck with trailer with one unit and loose boxes, a 70 crane, and 6 men.