Brookside Country Club

brookside country club exterior scaled

PROJECT TYPE: Design Build
INDUSTRY TYPE: Hotel and Recreational

The goal of this project was to remove the existing control system and install a new Taco iWorX system. This system manages the temperature in all the buildings at Brookside Country Club, including 11 air handlers, 1 boiler, 1 chiller, and 7 VAVs. Since the completion of this project in 2023, Brookside Country Club can monitor this system continuously and remotely through the web.